Singapore's 2026 new launch season is smaller than 2025's, more price-sensitive, and concentrated in a handful of well-located projects: Narra Residences opened the year in January, Amberwood at Holland previewed in September, and Thomson Reserve and Lucerne Grand are the large launches that define the final quarter. The useful way to compare them is by price per square foot (psf) against the nearby resale market, by distance to an MRT station, and by the monthly cost the buyer can actually carry. This guide sets out the projects, the pricing evidence, the rental backdrop and a checklist, so that a first-time buyer, an investor or an agent can compare launches on the same data.
TL;DR
- Narra Residences (Dairy Farm) opened the 2026 launch season, with one-bedders from S$998,000; Amberwood at Holland and Thomson Reserve followed in the second half of the year.
- Reported opening prices range from roughly S$2,100 psf at Narra Residences to S$2,921 psf at Amberwood at Holland, so location explains most of the gap.
- Price growth has slowed: URA's Q3 2026 figures show non-landed private prices up 1.0% quarter-on-quarter, with the outer central region (OCR) up 2.3%.
- Gross rental yields for condos are modest, with a 2026 islandwide median of 2.88%, so most new launch purchases are decided on own-stay value and exit price, not yield.
- Compare each launch against nearby resale transactions and test the monthly repayment before a booking, not after.
Table of Contents
- What counts as a 2026 new launch condo
- The main 2026 projects at a glance
- How 2026 launch prices are set
- Market conditions behind the 2026 launches
- Rents and yields for new launch buyers
- A checklist for comparing 2026 launches
- Financing a new launch purchase
- Our perspective
- Using haio to compare launches
- FAQ
- Sources
What counts as a 2026 new launch condo
A new launch condo is a private residential project sold by the developer directly to buyers, usually before construction is complete, under the progressive payment scheme. Buyers attend a preview, select a unit on the day bookings open, and pay in stages as construction advances. This differs from a resale condo, which is bought from an existing owner and has a recorded transaction history.
Executive condominiums (ECs) are a separate category: they are developer-built but carry eligibility rules and a minimum occupation period, so the figures in this guide refer to private condominiums unless stated otherwise.
The 2026 pipeline is thinner than the previous year. A Straits Times report from November 2025 estimated that new private condo launches would fall from 26 projects in 2025 to 17 in 2026. Fewer launches mean fewer direct comparisons within a single year, which makes the resale market and the neighbouring launches the main reference points.
The main 2026 projects at a glance
The table lists the projects with the most complete public information. Prices are opening or estimated psf figures as reported, and they move between preview and booking day.
| Project | Area | Scale and type | Reported pricing |
|---|---|---|---|
| Narra Residences | Dairy Farm (OCR) | 540 units, 99-year leasehold, eight blocks of six to 16 storeys | One-bedders from S$998,000 (about S$1,930 psf); two-bedders from S$1.17 million |
| Amberwood at Holland | Holland (prime area) | Boutique development | From S$2,921 psf at preview |
| Thomson Reserve | Upper Thomson, Bright Hill Drive | 1,268 units, two- to five-bedroom | Estimated S$2,600 to S$2,700 psf |
| Lucerne Grand | Lakeside Drive (D22) | 570 units, mixed-use, five 17-storey blocks | From-price analysed on haio at S$2,251 psf |
The sources behind these figures are covered below.
Narra Residences: the opening launch
Business Times reported on 8 January 2026 that Narra Residences, a 540-unit 99-year leasehold project at Dairy Farm, opened the year with public previews from 17 January and sales bookings from 31 January. One-bedders of 517 sq ft started at S$998,000 (about S$1,930 psf), two-bedders from S$1.17 million (S$2,100 psf), three-bedders from about S$1.6 million (S$1,956 psf) and four-bedders from S$2.4 million (S$2,100 psf). It is a useful reference because it shows how an OCR launch priced at the start of the year, before the slower second half.
Amberwood at Holland: the premium end
Lianhe Zaobao reported on 10 September 2026 that Amberwood at Holland began previews on 11 September with prices from S$2,921 psf. UOL's Chen Yiwen said pre-preview interest was strong and that the firm is committed to pragmatic pricing. The same report put the year-to-date median psf for new launches at S$2,108, which was 1.3% below the S$2,135 median for the same period in 2025. At S$2,921 psf, Amberwood sits well above that median, which reflects its prime-area location rather than a broad move in the market.
Thomson Reserve: the Q4 benchmark
Thomson Reserve is a 1,268-unit joint venture between UOL Group and CapitaLand Development on the former Thomson View en bloc site at Bright Hill Drive. It offers two- to five-bedroom units next to Upper Thomson MRT station and within 1 km of Ai Tong School. The S$810 million en bloc purchase was completed in October 2025.
Property Doctors' Dr Li Naijia estimated its launch price at S$2,600 to S$2,700 psf, and both he and ERA's president Zhu Yongqiang expected the pricing could set records for Upper Thomson and Bright Hill while remaining below core central region (CCR) new-launch prices, according to the same Lianhe Zaobao report. With over 1,200 units, it is the largest 2026 launch and the one most likely to indicate how buyers respond to a mature-estate address at a higher price.
Lucerne Grand: a family-focused OCR project
Stacked Homes describes Lucerne Grand as a 570-unit 99-year mixed-use project by CDL on Lakeside Drive, directly next to Lakeside MRT, with five 17-storey blocks, two- to four-bedroom units, a planned supermarket downstairs and an estimated TOP (temporary occupation permit, the point at which residents can move in) in 2030. haio's own analysis, Lucerne Grand: A $1,132 psf ppr Tender And A $2,251 psf Developer From-Price, sets the land cost per square foot of potential gross floor area (psf ppr) against the developer's from-price, which shows how much margin and cost sits between the tender and the sales brochure.
How 2026 launch prices are set
A developer's price starts with the land. The land cost per square foot of permitted floor area (psf ppr) is combined with construction, financing and marketing costs to give a breakeven price, and the launch price is then set above it according to location, unit mix and what is selling nearby. Our guide to how condo prices are set in Singapore walks through that sequence with examples.
For a buyer, the practical consequence is that the psf price of a launch has two reference points: the land cost beneath it and the transaction prices of nearby condos. A launch that is priced far above both needs a clear justification, such as a station on the doorstep, a mature school catchment or a significantly newer building.
Property Doctors' Dr Li Naijia, quoted in the Lianhe Zaobao report, said that the launches which performed best early in 2026 combined MRT convenience, proximity to schools and mature estates, and pricing that was reasonable against nearby resale and comparable new projects. In his view buyers will pay a premium only with a reasonable justification, and latent demand has not weakened: buyers have become more selective in a cautious macro and geopolitical environment.
Market conditions behind the 2026 launches
URA's release of third-quarter 2026 real estate statistics on 23 October 2026 shows non-landed private home prices rising 1.0% quarter-on-quarter, led by the OCR at 2.3%. The same release shows private residential rents up 1.3% on the quarter, with OCR non-landed rents up 3.1%, the rest of central region (RCR) up 1.5% and the CCR down 0.3%. URA publishes these figures quarterly, with a flash estimate at the start of each quarter, so a reader should check the latest release before relying on any single quarter.
UOL's Chen Yiwen told Lianhe Zaobao that price growth has shown signs of slowing after 2025's strong performance and that buyers are more cautious, which the company describes as a more balanced and sustainable market. UOL expects the private market to stay broadly stable through the rest of 2026 and 2027, with well-located, well-designed and reasonably priced projects still favoured.
Our reading of the broader price picture is in the H1 2026 property market review and the note on condo price trends, which show the overall increase coming on lower transaction volumes. The new launch pipeline guide lists what is still to come, and the note on government land sales and en bloc potential explains how land supply feeds future launches.
Rents and yields for new launch buyers
A buyer who plans to rent the unit out should treat yield as a constraint. Dollars and Sense's 2026 condo rental yield study, covering 1,295 private projects and published on 22 August 2026, found a median gross yield of 2.88% islandwide, from a median rent of S$4,300 a month against a median price of S$1.79 million. Several OCR districts that host 2026 launches sit above that median:
| District | Area | Median gross yield |
|---|---|---|
| D22 | Jurong East, Boon Lay | 3.39% |
| D17 | Loyang, Changi | 3.22% |
| D27 | Yishun, Sembawang | 3.22% |
| D18 | Tampines | 3.16% |
| D23 | Bukit Panjang | 3.00% |
| D16 | Bedok | 3.00% |
Smaller units yield more: the study puts the median for one-bedders at 4.24% against 2.92% for four-bedders. These are gross figures, before maintenance fees, property tax, agent fees and vacancy.
On leasing demand, Savills' Q3 2026 leasing briefing reports a record 28,423 private residential rental contracts (excluding ECs) commencing in the quarter, up 25.6% on the previous quarter, while the overall vacancy rate rose to 7.2%. Strong volume with rising vacancy means tenants have choice, which caps how quickly a new owner can raise rent. Tenants can read the same trend in our note on vacancy and tenant leverage.

A checklist for comparing 2026 launches
The following steps apply equally to a first-time buyer and an investor, and an agent can use them to present the comparison to a client with the same data on the table.
- Compare psf with nearby transactions. Find recent resale and new-launch transactions within a short distance and compare the psf at similar floor levels and unit sizes. A launch premium of a few hundred dollars psf over a resale condo is common, but the reason for it should be identifiable (a newer lease, a station, a larger facilities package).
- Check the land cost. A launch priced just above its estimated breakeven leaves the developer room to negotiate or adjust; one priced far above it has less obvious flexibility. The land price is public for government land sales sites and en bloc deals.
- Measure the walk to the station. Both Thomson Reserve and Lucerne Grand are next to an MRT station. Note, however, that Stacked Homes' reviewer observed for Lucerne Grand that not every unit receives the same lake view and that train noise from the elevated tracks cannot be fully judged until construction is complete, so the stack and floor matter as much as the project.
- Read the completion date. Lucerne Grand's estimated TOP is 2030. A buyer who needs to move in within two years should confirm the completion date, and the cost of renting in the interim, before booking.
- Test the repayment, not just the price. Work out the monthly instalment at a higher interest rate than today's, include the progressive payment schedule, and compare it with income. The Affordability tool on haio does this against a budget, tenure and property type.
- Set the exit price. Cushman & Wakefield's Wong Xian Yang described buyers as very price-sensitive around the S$2.5 million mark, according to market commentary on the Q4 launches. A unit priced just below a common budget threshold usually has a wider pool of future buyers than one just above it.
Financing a new launch purchase
New launch purchases are financed through progressive disbursements: the buyer pays a booking fee, then a deposit, then instalments as each construction stage is certified. Banks assess the loan against income, existing debt and the lending limits set by regulators, so a buyer should know the affordable price range before attending a preview. This overview of condo mortgage requirements and what lenders check sets out the documents and ratios that lenders typically review.
Haio's mortgage rate comparison and personalised affordability checks are designed for this step, so that the price range is fixed from the buyer's own figures before the preview, not after the booking fee is paid.
Our perspective
The 2026 launch season rewards buyers who arrive with data. With fewer launches, softer take-up and prices rising slowly, the difference between a good and a poor purchase is often a few hundred dollars psf, and that difference is visible only when the launch price is set against transaction history, land cost and the buyer's own budget.
This is the reason haio combines Singapore residential data sources in one place: valuation, price history, market analysis, affordability and mortgage rates sit together, so a first-time buyer can see what a launch costs relative to the neighbourhood, an investor can see the yield and exit assumptions, and an agent can show a client unbiased figures. Our view is that a launch is best judged project by project, on the same measures, and that transparent pricing is what lets each buyer decide when a premium is justified.
The project pages on haio, such as the transaction histories for nearby condos, are the natural starting point for the comparison in the checklist above.
HAIO
Using haio to compare launches
Haio's free tools cover the transaction data and market analysis that the checklist relies on, and the haio+ plan adds premium analytics, valuation reports and Master Plan tools for S$49 per month or S$499 per year. Property Analysis gives the market view for a project and its surroundings, haio's List brings the listings together, and haio News follows launch pricing and sales results as they are published.
FAQ
Which new launch condos are on the market in Singapore in 2026?
Narra Residences at Dairy Farm opened the year in January, Amberwood at Holland previewed in September, and Thomson Reserve at Bright Hill Drive and Lucerne Grand at Lakeside Drive are the large launches for the fourth quarter. Launch timing can move, so the new launch pipeline guide is the place to check the current list.
How much do 2026 new launch condos cost per square foot?
Reported opening prices run from about S$1,930 psf for a one-bedder at Narra Residences to S$2,921 psf at Amberwood at Holland, with Thomson Reserve estimated at S$2,600 to S$2,700 psf. The year-to-date median for new launches was S$2,108 psf at the time of the September Lianhe Zaobao report, so the premium of a project depends mainly on its location.
Are new launch condos a good investment in 2026?
The median gross rental yield for condos is 2.88% islandwide, and OCR districts reach about 3.0% to 3.4%, so rental income alone is modest. Price growth also slowed, with URA reporting a 1.0% rise in non-landed prices in Q3 2026. Investors usually weigh location, unit size and the likely exit price against these figures.
What should a first-time buyer check before booking a new launch?
Compare the psf with nearby resale transactions, confirm the expected TOP date, and calculate the monthly instalment under the progressive payment schedule. An affordability check against the buyer's own income and budget should come before the preview, so that the booking decision rests on a fixed range.
Sources
- Narra Residences kicks off 2026's new launches, Business Times
- Thomson Reserve and Amberwood at Holland launch coverage, Lianhe Zaobao
- UOL readies Thomson Reserve condo launch, Yahoo News
- Lucerne Grand review, Stacked Homes
- Release of 3rd Quarter 2026 real estate statistics, URA
- Singapore residential leasing briefing Q3 2026, Savills
- Guide to condo rental yields in Singapore 2026, Dollars and Sense
- Condo mortgage requirements: what lenders check in 2026
